Address |
345 San Ha Street, Chai Wan, Hong Kong |
Location |
|
Enquiry No. |
2558 3538 |
Facilities |
Main pool (Length 50m x Width 21m, Depth: 1.4m-1.9m) Secondary pool (Length 50m x Width 21m, Depth: 1.1m-1.4m) Training pool (Length 25m x Width 11m, Depth: 0.9m-1.2m) *Teaching pool 1 (Length 21m x Width 12m, Depth: 0.83m-1.05m) Teaching pool 2 (Length 21m x Width 12m, Depth: 0.68m-0.9m) Diving pool (Length 11m x Width 11.75m, Depth: 4.4m-4.6m) Leisure pool 1 (Irregular shape, Depth: 0.39m-0.5m) Leisure pool 2 (Irregular shape, Depth: 0.39m-0.45m) Leisure pool 3 (Irregular shape) Spectator stand (800 seats), Family changing room Barrier Free Facilities: Barrier free access(es) facilitating entrance to the pool deck area, Accessible lifting platform (Teaching pool), Accessible toilets and shower compartments, Tactile guide path, Visual fire alarm system, Braille floor map
|
|
Summer Opening Schedule Information
|
|
Apr |
May |
Jun |
Jul |
Aug |
Sep |
Oct |
1st Session: 6:30 am - 12:00 nn
2nd Session: 1:00 - 5:00 pm
3rd Session: 6:00 - 10:00 pm
(Session breaks: 12:00 nn - 1:00 pm & 5:00 - 6:00 pm) |
|
|
Temporary Closure for Annual Maintenance
|
Whole pool complex: From 1 November to 31 March of the following year
|
|
Weekly Cleansing Operation
The weekly cleansing operation is carried out at public swimming pools managed by the LCSD from 10:00 a.m. to the end of the second session. The pools will resume service at the third session on the same day. ※ If the cleansing day falls on a public holiday, the swimming pool will open as usual and the weekly cleansing operation will be rescheduled for another weekday (as shown in the bracket) of the same week.
|
Every Tuesday
(Thursday ※)
|
|
|
Notice of Temporary ClosureDetails of the temporary partial closure of facilities at swimming pools: Please contact the officers-in-charge of the respective swimming pools on the telephone numbers listed above for details of the latest arrangements. |
Date & Time |
Facilities |
Reason |
Remarks |
2022/07/03 06:30 - 2022/07/03 08:00 |
Not applicable
|
Others
|
The Main pool/ Secondary pool/Spectator Stand of this pool have reopened .In order to comply with the requirements stipulated in the Prevention and Control of Disease (Requirements and Directions) (Business and Premises) Regulation (Cap. 599F), the maximum capacity of this swimming pool has been reduced to 1190 persons.
|
2022/07/03 08:00 - 2022/07/03 12:00 |
Not applicable
|
Others
|
The Main pool/ Secondary pool/ Training pool/ Teaching pool 1 / Teaching pool 2/Spectator Stand of this pool have reopened .In order to comply with the requirements stipulated in the Prevention and Control of Disease (Requirements and Directions) (Business and Premises) Regulation (Cap. 599F), the maximum capacity of this swimming pool has been reduced to 1319 persons.
|
2022/07/03 06:30 - 2022/07/03 08:00 |
Training Pool, Teaching Pool (1), Teaching Pool (2), Leisure Pool (1), Leisure Pool (2), Fountain Pool, Diving Pool , Leisure Pool (3)
|
Contamination of Pool Water
|
Object Found:
Nil
|
2022/07/03 08:00 - 2022/07/03 12:00 |
Leisure Pool (1), Leisure Pool (2), Fountain Pool, Diving Pool , Leisure Pool (3)
|
Insufficient Lifeguard
|
N/A
|
2022/07/03 13:00 - 2022/07/03 22:00 |
Not applicable
|
Others
|
The Main pool/ Training pool/ Teaching pool 1 / Teaching pool 2/Leisure pool 1/Leisure pool 3/Spectator Stand of this pool have reopened .In order to comply with the requirements stipulated in the Prevention and Control of Disease (Requirements and Directions) (Business and Premises) Regulation (Cap. 599F), the maximum capacity of this swimming pool has been reduced to 784 persons.
|
2022/07/03 13:00 - 2022/07/03 22:00 |
Secondary Pool, Leisure Pool (2), Diving Pool
|
Insufficient Lifeguard
|
N/A
|
|
Photo |
 |