Information on Public Swimming Pools

 

Hin Tin Swimming Pool

Address 68 Che Kung Miu Road, Tai Wai, Sha Tin.
Location Location Map Link to GeoInfo Map
Phone No. 2607 3423
Facilities

Indoor facilities:
*^Main pool (Length 50m x Width 25m, Depth: 1.4m-2m)
^Jacuzzi pool (Circular, Depth: 0.85m)
Family changing room
Outdoor facilities:
Training pool (Length 25m x Width 11m, Depth: 0.8m-1.2m)
Leisure Pool (Shallow Water Zone) (Irregular shape, Depth: 0.3m-0.86m)
Leisure Pool (Deep Water Zone) (Irregular shape, Depth: 0.83m-1.5m)
Small Water Slides (Irregular shape, Depth: 0.83m-0.9m)
Giant Water Slides (Irregular shape, Depth: 0.85m-0.9m)
Toddlers' Zone (Irregular shape, Depth: 0.35m-0.5m)
Barrier free facilities: Barrier free entrance, Accessible toilets and shower compartments, Accessible services counter, Tactile guide path, Visual fire alarm system, Braille directory map/floor plan, Pool lift


Summer Opening Schedule Information

Apr May Jun Jul Aug Sep Oct

1st Session:
6:30 am - 12:00 nn

2nd Session:
1:00 - 6:00 pm

3rd Session:
7:00 - 10:00 pm

(Session breaks:
12:00 nn - 1:00 pm 
& 6:00 - 7:00 pm)

Indoor main pool
and jacuzzi only

(Maintenance of
outdoor leisure pool
and training pool :
1.4.2024  - 15.4.2024)
1st Session:
6:30 am - 12:00 nn

2nd Session:
1:00 - 6:00 pm

3rd Session:
7:00 - 10:00 pm

(Session breaks:
12:00 nn - 1:00 pm & 6:00 - 7:00 pm)
1st Session:
6:30 am - 12:00 nn

2nd Session:
1:00 - 6:00 pm

3rd Session:
7:00 - 10:00 pm

(Session breaks:
12:00 nn - 1:00 pm
& 6:00 - 7:00 pm)

Outdoor leisure pool and training pool only
(Maintenance of indoor main pool
and jacuzzi:11.9.2024 - 31.10.2024)

Temporary Closure for Annual Maintenance

Indoor pools (Main pool ,Jacuzzi pool): 
From 11 September to 31 October
Outdoor pools (Training pool, Leisure pool): 
From 1 November to 15 April of the following year

Weekly Cleansing Operation

The weekly cleansing operation is carried out at public swimming pools managed by the LCSD from 10:00 a.m. to the end of the second session. The pools will resume service at the third session on the same day.
※ If the cleansing day falls on a public holiday, the swimming pool will open as usual and the weekly cleansing operation will be rescheduled for another weekday (as shown in the bracket) of the same week.

Every Thursday
(Wednesday ※)

Notice of Temporary Closure

Details of the temporary partial closure of facilities at swimming pools:
Please contact the officers-in-charge of the respective swimming pools on the phone number(s) listed above for details of the latest arrangements.
Date & Time Facilities Reason Remarks
2024/04/16 06:30 - 2024/09/11 06:30 Leisure Pool (Deep Water Zone) Insufficient Lifeguard N/A
Photo Photo

Remarks
^ Heated swimming pool facilities will be provided from November to mid-April of the following year.
() No. of facilities
* Equipped with a pool lift for use by persons with disabilities
 
Note 1 The opening schedule of the public swimming pool is for reference only and subject to changes with notices. For the latest opening arrangements, please contact the public swimming pool on the phone number(s) provided in the table above. Information of temporary closure notice of public swimming pools is for today and the next 29 days.
Note 2 For the latest information on public swimming pools (such as temporary closure of the whole swimming pool complex due to emergencies), please visit our webpage on Press Releases.
Note 3 The weekly cleansing operation is carried out from 10:00 a.m. to the end of the second session. The swimming pool will reopen at the third session on the same day. If the weekly cleansing day falls on a public holiday, the swimming pool will open as usual and the weekly cleansing operation will be rescheduled for another weekday of the same week.
Note 4 All public swimming pools are closed on the first three days of the Lunar New Year.
Note 5 For the procedure of booking of public swimming pools by organisations, please refer to Guide to the Booking Procedure for Use of Public Swimming Pools.
Top