Address |
25 Kwong Lee Road, Kowloon, Hong Kong |
Location |
|
Phone No. |
2387 4224,2708 1204 |
Facilities |
Main pool (Length 50m x Width 21m, Depth: 1.37m-1.93m) Secondary pool (Length 50m x Width 20m, Depth: 1.07m-1.37m) *Teaching pool 1 (Length 18.2m x Width 12.1m, Depth: 0.84m-1.07m) Teaching pool 2 (Length 18.2m x Width 12.1m, Depth: 0.69m-0.91m) Teaching pool 3 (Length 18.2m x Width 12.1m, Depth: 0.69m-0.91m) Diving pool (Length 10.6m x Width 10.6m, Depth: 3.5m-3.61m) Children's pool (Irregular shape, Depth: 0.28m-0.33m) Spectator stand (700 seats), Family changing room Barrier Free Facilities: Barrier free access(es) facilitating entrance to the pool deck area, Accessible toilets and shower compartments, Accessible lifting platform (Teaching pool), Braille and tactile floor plan, Tactile Guide Path, Visual Fire Alarm System
|
|
Winter Opening Schedule Information
|
|
Nov |
Dec |
Jan |
Feb |
Mar |
Apr |
May |
Maintenance 1.11.2024 - 31.3.2025
| 1st Session: 6:30 am - 12:00 nn
2nd Session: 1:00 - 6:00 pm
3rd Session: 7:00 - 10:00 pm
(Session breaks: 12:00 nn - 1:00 pm & 6:00 - 7:00 pm) |
|
|
Temporary Closure for Annual Maintenance
|
From 1 November to 31 March of the following year
|
|
Weekly Cleansing Operation
The weekly cleansing operation is carried out at public swimming pools managed by the LCSD from 10:00 a.m. to the end of the second session. The pools will resume service at the third session on the same day. ※ If the cleansing day falls on a public holiday, the swimming pool will open as usual and the weekly cleansing operation will be rescheduled for another weekday (as shown in the bracket) of the same week.
|
Every Thursday
(Tuesday ※)
|
|
|
Notice of Temporary ClosureDetails of the temporary partial closure of facilities at swimming pools: Please contact the officers-in-charge of the respective swimming pools on the phone number(s) listed above for details of the latest arrangements. |
Date & Time |
Facilities |
Reason |
Remarks |
No related notice
|
|
Photo |
 |