Information on Public Swimming Pools
Kennedy Town Swimming Pool
Address |
2 Sai Cheung Street North, Kennedy Town |
Location |
|
Enquiry No. |
2817 7973, 2817 4504 |
Facilities |
Indoor Facilities :
*^Secondary pool (Length 50m x Width 15m, Depth: 1.2m-1.4m) *^Training pool (Length 25m x Width 12.5m, Depth: 0.9m-1.2m) *^Jacuzzi (Depth: 0.85m) Family changing room
Outdoor Facilities :
*Secondary pool (Length 50m x 25m, Depth: 1.1m-1.4m)
Leisure pool (Irregular shape, Depth: 0m-0.85m)
Barrier Free Facilities: Barrier free access(es) facilitating entrance to the pool deck area, Accessible lifting platform(s) (Secondary pool, Training pool and Jacuzzi), Accessible Toilet(s) & Changing Room(s), Accessible Lift (with Assistive Listening System), Tactile Guide Path, Visual Fire Alarm System, Braille and tactile floor plan, Assistive Listening System.
|
|
Summer Opening Schedule Information
|
|
Apr |
May |
Jun |
Jul |
Aug |
Sep |
Oct |
1st Session:6:30 am - 12:00 nn
2nd Session:1:00 - 5:00 pm
3rd Session: 6:00 - 10:00 pm
(Session breaks:12:00 nn - 1:00 pm& 5:00 - 6:00 pm)
Indoor pool only (Maintenance of outdoor pool:1.4.2022- 15.4.2022) | 1st Session: 6:30 am - 12:00 nn
2nd Session: 1:00 - 5:00 pm
3rd Session: 6:00 - 10:00 pm
(Session breaks: 12:00 nn - 1:00 pm & 5:00 - 6:00 pm) | 1st Session: 6:30 am - 12:00 nn
2nd Session: 1:00 - 5:00 pm
3rd Session: 6:00 - 10:00 pm
(Session breaks: 12:00 nn - 1:00 pm & 5:00 - 6:00 pm)
Outdoor pool only (Maintenance of indoor pool: 11.9.2022-31.10.2022) |
|
|
Temporary Closure for Annual Maintenance
|
Indoor pools : From 11 September to 31 October Outdoor pools : From 1 November to 15 April of the following year
|
|
Weekly Cleansing Operation
The weekly cleansing operation is carried out at public swimming pools managed by the LCSD from 10:00 a.m. to the end of the second session. The pools will resume service at the third session on the same day. ※ If the cleansing day falls on a public holiday, the swimming pool will open as usual and the weekly cleansing operation will be rescheduled for another weekday (as shown in the bracket) of the same week.
|
Every Wednesday
(Thursday ※)
|
|
|
Notice of Temporary ClosureDetails of the temporary partial closure of facilities at swimming pools: Please contact the officers-in-charge of the respective swimming pools on the telephone numbers listed above for details of the latest arrangements. |
Date & Time |
Facilities |
Reason |
Remarks |
2022/05/12 06:30 - Until further notice |
|
Others
|
The Indoor Secondary pool/ Outdoor Secondary pool/ Training pool/ Leisure pool/Jacuzzi of this pool have reopened .In order to comply with the requirements stipulated in the Prevention and Control of Disease (Requirements and Directions) (Business and Premises) Regulation (Cap. 599F), the maximum capacity of this swimming pool has been reduced to 766 persons
|
|
Photo |
 |
Sun Yat Sen Memorial Park Swimming Pool
Address |
16 Eastern Street North, Sai Ying Pun, Hong Kong |
Location |
|
Enquiry No. |
2540 6708, 2547 3982 |
Facilities |
Indoor Facilities: *^Main pool (Length 50m x Width 25m, Depth: 1.4m-1.9m) *^Training pool (Length 25m x Width 12.5m, Depth: 0.9m-1.2m) Spectator stand (1000 seats), Electronic scoreboard, Family changing room Barrier Free Facilities: Barrier free access(es) facilitating entrance to the pool deck area, accessible lifting platform (Main pool and Training pool), accessible toilet(s) and changing room(s), accessible car parking space (1 designated car parking space), accessible lift (with assistive listening system), tactile guide path, visual fire alarm system, braille and tactile floor plan, assistive listening system.
|
|
Summer Opening Schedule Information
|
|
Apr |
May |
Jun |
Jul |
Aug |
Sep |
Oct |
1st Session: 6:30 am - 12:00 nn
2nd Session: 1:00 - 5:00 pm
3rd Session: 6:00 - 10:00 pm
(Session breaks: 12:00 nn - 1:00 pm & 5:00 - 6:00 pm)
| Maintenance 16.4.2022 - 5.6.2022
| 1st Session: 6:30 am - 12:00 nn
2nd Session: 1:00 - 5:00 pm
3rd Session: 6:00 - 10:00 pm
(Session breaks: 12:00 nn - 1:00 pm & 5:00 - 6:00 pm) |
|
|
Temporary Closure for Annual Maintenance
|
|
Weekly Cleansing Operation
The weekly cleansing operation is carried out at public swimming pools managed by the LCSD from 10:00 a.m. to the end of the second session. The pools will resume service at the third session on the same day. ※ If the cleansing day falls on a public holiday, the swimming pool will open as usual and the weekly cleansing operation will be rescheduled for another weekday (as shown in the bracket) of the same week.
|
Every Tuesday
(Friday ※)
As Sun Yat Sen Memorial Park Swimming Pool has undergone thorough cleansing and disinfection before its reopening for public use on 6 June 2022, the first scheduled weekly cleansing day on 7 June 2022(Tuesday)
will be cancelled. The swimming pool will provide normal service on that day.
|
|
|
Notice of Temporary ClosureDetails of the temporary partial closure of facilities at swimming pools: Please contact the officers-in-charge of the respective swimming pools on the telephone numbers listed above for details of the latest arrangements. |
Date & Time |
Facilities |
Reason |
Remarks |
2022/04/16 06:30 - 2022/06/05 22:00 |
Main Pool , Training Pool
|
Others
|
Sun Yat Sen Memorial Park Swimming Pool is closed from 16.4.2022 to 5.6.2022 for annual maintenance.
|
2022/05/20 06:30 - Until further notice |
Main Pool , Training Pool , Spectator Stand
|
Others
|
The Main pool, Training pool and Spectator Stand of this pool will be reopened on 6 June 2022. In order to comply with the requirements stipulated in the Prevention and Control of Disease (Requirements and Directions) (Business and Premises) Regulation (Cap. 599F), the maximum capacity of this swimming pool has been reduced to 884 persons.
|
2022/06/11 07:30 - 2022/06/11 14:00 |
Main Pool , Training Pool
|
Others
|
Function : HKDSE PE Practical Examination
Organization : Hong Kong Examinations and Assessment Authority
|
2022/06/12 07:30 - 2022/06/12 20:00 |
Main Pool , Training Pool
|
Competition
|
Function : Long Course Masters Swimming Competition – Part 3
Organization : China Hong Kong Swimming Association
|
2022/06/18 07:30 - 2022/06/18 22:00 |
Main Pool , Training Pool
|
Competition
|
Function : Division 2 (Part 2) Long Course Competition
Organization : China Hong Kong Swimming Association
|
|
Photo |
 |
Remarks
^
|
Heated swimming pool facilities will be provided from November to mid-April of the following year.
|
()
|
No. of facilities
|
*
|
Equipped with a pool lift for use by persons with disabilities
|
|
Note 1
|
The opening schedule of the public swimming pool is for reference only and subject to changes with notices. For the latest opening arrangements, please contact the public swimming pool on the telephone numbers provided in the table above. Information of temporary closure notice of public swimming pools is for today and the next 29 days.
|
Note 2
|
For the latest information on public swimming pools (such as temporary closure of the whole swimming pool complex due to emergencies), please visit our webpage on Press Releases.
|
Note 3
|
The weekly cleansing operation is carried out from 10:00 a.m. to the end of the second session. The swimming pool will reopen at the third session on the same day. If the weekly cleansing day falls on a public holiday, the swimming pool will open as usual and the weekly cleansing operation will be rescheduled for another weekday of the same week.
|
Note 4
|
All public swimming pools are closed on the first three days of the Lunar New Year.
|
Note 5
|
For the procedure of booking of public swimming pools by organisations, please refer to Guide to the Booking Procedure for Use of Public Swimming Pools.
|