Leisure and Cultural Services Department - Antiquities and Monuments Office | Brand Hong Kong - Asia's world city
GovHK | Graphical Mode | Traditional Chinese | Simplified Chinese | Search | Site Map | Contact Us [ Size 1 | Size 2 | Size 3 ]

About Us | What's New | Archaeology | Built Heritage | Declared Monuments | Heritage Impact Assessment | Hong Kong Heritage Discovery Centre | Ping Shan Tang Clan Gallery cum Heritage Trail Visitors Centre | Heritage Trails | Docent Services| Wun Yiu Exhibition | Online Exhibition | Friends of Heritage | Young Friends of Heritage | FAQ | Links | Research Resources and Reports | Download Area | Back to Cultural Services | Back to LCSD

Research report/publications >

Research Report / Publications

Archaeological Research Reports
-
Planning and Engineering Study on Development of Lok Ma Chau Loop
Archaeological Field Survey Final Report (35MB)
-
North East New Territories New Development Areas Planning and Engineering Study
Archaeological Field Survey Final Report (73MB)
-
Interpretation Study on the Site of Former Mountain Lodge and its Surrounding Areas
 
  • Part 1 - Statement of Significance
  •  
  • Part 2 - Study Report
  •  
  • Executive Summary
  • -
    Brief on the Archaeological Work at Sacred Hill (North) Study Area for Shatin to Central Link (SCL) – Tai Wai to Hung Hom Section (December 2012)
    -
    Brief on the Cultural Remains of Song-Yuan Period Unearthed by Archaeological Work at Sacred Hill (North) Study Area for Shatin to Central Link (SCL) – Tai Wai to Hung Hom Section (March 2013)
    -
    Brief on the Cultural Remains of Song-Yuan Period Unearthed by Archaeological Work at Sacred Hill (North) Study Area for Shatin to Central Link – Tai Wai to Hung Hom Section (September 2013)
    -
    Brief on the Cultural Remains of Song-Yuan Period Unearthed by Archaeological Work at Sacred Hill (North) Study Area for Shatin to Central Link – Tai Wai to Hung Hom Section (November 2013)
    -
    Brief on the Cultural Remains of Song-Yuan Period Discovered during Archaeological Watching Brief at the Launching Shaft Area of the Sung Wong Toi Station of Shatin to Central Link – Tai Wai to Hung Hom Section (April 2014)
    -
    Brief on the Sheetpile Proposal for Retaining T1 Area at the Launching Shaft Area, of the To Kwa Wan Station of Shatin to Central Link – Tai Wai to Hung Hom Section (May 2014)
    -
    Interim Report on the Archaeological Survey cum Excavation Findings in Sacred Hill (North) for Shatin to Central Link (Tai Wai to Hung Hom Section) (14 MB)
    -
    Interim Report on the Archaeological Watching Brief Findings in Harcourt Garden for South Island Line (East) (7MB)
    -
    Final Report on the Archaeological Watching Brief Findings in Harcourt Garden for South Island Line (East) (15M)
    -
    Report on the Archaeological Watching Brief for West Island Line (12M)
    -
    Archaeological Reports related to the Hong Kong Section of Guangzhou-Shenzhen- Hong Kong Express Rail Link Project
     
  • The Hong Kong Section of Guangzhou-Shenzhen- Hong Kong Express Rail Link Archaeological Impact Assessment (22MB)
  •  
  • Shek Kong Stabling Sidings Further Archaeological Investigation Report (13MB)
  •  
  • Tai Kong Po Emergency Assess Point Further Archaeological Investigation Report (19MB)
  •  
  • Tse Uk Tsuen Works Area- Archaeological Watching Brief Report (7MB)
  •  
  • Shek Kong Stabling Sidings Final Archaeological Excavation Report (17MB)
  • -
    Provision of Architectural Designs of Protection and Visitor Facilities for Rock Carvings and Inscription in Hong Kong (23MB)
    -
    Rock Carvings Consultancy Study Reports
     
  • Consultancy Study on the Preservation of Ancient Rock Carvings of Hong Kong (77MB)
  •  
  • Study Project on the Preservation of Nine Rock Art Carvings in Hong Kong (7MB)
  •  
  • Preservation of Nine Rock Carvings in Hong Kong: A Consultancy Study of Ancient Rock Carvings (11MB)
  •  
  • Condition Survey of Nine Rock Carvings: A Study of the Condition, Management and Treatments of Nine Sites within the Hong Kong Autonomous Boundaries
  •   So Kwun Wat 2008 Rescue Excavation Report (Chinese version only)
    Available for public viewing at the Reference Library of the Hong Kong Heritage Discovery Centre by appointment (Tel: 2208 4428)
    -
    Further Study of Wun Yiu, Tai Po, Hong Kong (Chinese version only)
    -
    Reassessment of the Boundary of the Guidi Gang Reserve Area in Wun Yiu, Tai Po (Chinese version only) (32MB)
    -
    Feasibility Study on Conservation and Development of Wun Yiu Pottery Kiln Site - Executive Summary (6MB)
    The full set of consultancy reports is available at the Reference Library of the Hong Kong Heritage Discovery Centre for viewing by appointment (Tel: 2208 4428)
    -
    Cheung Shue Tan Archaeological Site, Tai Po 2006 Excavation Report (Chinese version only with English Summary) (11MB)
    -
    Former Hollywood Road Police Married Quarters 2007
    Site Investigation Report
     
  • List of Annex
  •    
     
  • Annex (12 MB)
  •    
    -
    Former Mountain Lodge 2007 Archaeological Survey Interim Report    
     
  • Annex A
  •    
     
  • Annex B
  •    
     
  • Annex C
  •    
     
  • Annex D
  •    
     
  • Annex E
  •    
    -
    Working Report of the Archaeological Works at Former Mountain Lodge
     
  • Annex A
  •    
     
  • Annex B
  •    
     
  • Annex C
  •    
     
  • Annex D
  •    
     
  • Annex E
  •    
    -
    Remnants of Lung Tsun Stone Bridge in Kai Tak Area
     
  • Further Archaeological Excavation Report (17MB)
  •  
  • Conservation Management Plan for the Site of Lung Tsun Stone Bridge (6MB)
  •  
  • Lung Tsun Stone Bridge Full Excavation Report (52MB)
  •  
  • A Research on Lung Tsun Stone Bridge and its surrounding area (Chinese version only) (8.26MB)
  •  
  • Interpretation Principles and Guidelines for the Lung Tsun Stone Bridge Preservation Corridor (63MB)
  • -
    Report on the Optical Dating of Wong Tei Tung Archaeological Site
    -
    Report on the Date of the Wong Tei Tung Archaeological Assemblage
    -
    Archaeological Impact Assessment for Redevelopment of Chi Ma Wan Prison Area, Lantau Island (6MB)
  •        
           
    Built Heritage
    -
    Consultancy Study on the Historic Value of Ho Tung Gardens (Chinese version only with English Summary) (24MB)
    -
    Consultancy Study on the Architectural Value of Ho Tung Gardens (5MB)
    -
    Planning of Adaptive Lui Seng Chun (25M)
    -
    Conservation Study of Chik Kwai Study Hall at Pak Heung (25MB)
    -
    Summary of the Report on Site Investigation and Restoration Options -- King Yin Lei at 45 Stubbs Road, Hong Kong
    -
    Report on Site Investigation and Restoration Options -- King Yin Lei at 45 Stubbs Road, Hong Kong (Chinese version only)
    -
    Restoration Project of King Law Ka Shuk
    -
    Heritage Study on Central Government Offices Complex
           
           
    Research and Education
    -
    Location Map of Hong Kong Cemetery (with locations of some graves)
    -
    Study on Old Trails in Hong Kong
     
  • Desk-top Study Report (91MB)
  •  
  • Final Study Report (84MB)
  •  
  • Executive Summary
  •        
           
           
    

    Top

    2004 © | Important notices | Privacy policy | Accessibility | Last revision date: 10 June, 2014

    End of page